Life Cycle Component Examples

Operation and Component Calculation View

Components NPV Calculator

Introduction
This tool calculates net present value totals for operation and component uris. The discounted totals include operating, allocated overhead, capital, and incentive-adjusted totals. Operations or components that have an effective life different than 1 period include annual totals. Resource stock analyzers use the scheduling and timeliness parameters for labor and capital stock planning.

Calculation View Description
Sample data set used in a DevTreks tutorial. v175e

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Component Examples/552/none

Step 1 of 3. Make Selections


Step 2 of 3. Calculate

Relations

Use In Descendants?
Overwrite Descendants?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions (beta)

Step 1

  • Step 1. Real and Nominal Rates: The nominal rate includes inflation while the real rate does not. In the USA, DevTreks recommends using Office of Management and Budget rates for the same year as the date of the input.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 3. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 2. Alternative Type: This property is used to analyze differences between Alternatives.
  • Step 2. Target Type: This property is used to analyze progress being achieved with budget goals.
  • Step 2. Calculated Results: Please refer to the references below.

References

  • Hallam, Eidman, Morehart and Klonsky (editors) Commodity Cost and Returns Estimation Handbook, Staff General Research Papers, Iowa State University, Department of Economics, 1999

Current view of document
DevTreks -social budgeting that improves lives and livelihoods
Component Group : Life Cycle Component Examples
Document Status : underrevision
Description : This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Label : none Component Type : 0
Is Price List? : False
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
NIST Style Component (11/29/2012 12:00:00 AM)
12/31/2012 none none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This component is used in a DevTreks life cycle costs tutorial
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 821,605.31 821,605.31 2,155.88
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 242,686.23 242,686.23 636.81
Total Costs - Component 1,064,291.54 1,064,291.54 2,792.69
Total Costs - Component w. Incentives 1,064,291.54 1,064,291.54
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
NIST Table 5-4 (11/7/2014 12:00:00 AM)
12/31/2012 NIST135 none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using a life cycle cycle input calculator. This example comes from table 5-4.in NIST Handbook 135, Life Cycle Costing Manual.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 424,198.42 424,198.42 11,508.99
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 136,093.09 136,093.09 3,692.36
Total Costs - Component 560,291.51 560,291.51 15,201.35
Total Costs - Component w. Incentives 560,291.51 560,291.51
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
NIST Table 5-5 (11/7/2014 12:00:00 AM)
12/31/2012 NIST135 none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using a life cycle cycle input calculator. This example comes from table 5-5.in NIST Handbook 135, Life Cycle Costing Manual.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 355,231.13 355,231.13 9,637.83
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 114,884.94 114,884.94 3,116.96
Total Costs - Component 470,116.07 470,116.07 12,754.79
Total Costs - Component w. Incentives 470,116.07 470,116.07
Inputs
Dataset: Life Cycle Component Examples IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.